Projects

On going and finished industrial projects:

Senior Gas Metering Engineer, Study of Metering System Selection for Wet Gas Application, Energy Equity Epic Sengkang (EEES) – LAPI ITB, 2015. Responsibility: To study and to determine gas metering for wet gas application.

Senior Instrument Engineer, HAZOP Study and Risk Comparison of Two Methods of Line Break System Installation on Badak – Bontang Pipeline, VICO Indonesia – LAPI ITB, 2015. Responsibility: To identify hazard and operability and also to compare risk between two methods of line break system (LBS) installation on Badak-Bontang Pipeline in scope of instrumentation.

Senior Instrument Engineer, Multipurpose Demoplant for Hydroprocessing and Hybrid Bio Diesel Product, PT. Pertamina (Persero), 2015. Responsibility: To design the instrumentation and control in multipurpose demoplant for hydroprocessing and hybrid bio diesel product.

Project Manager, Study of Natural Gas and Compressed Natural Gas Custody Transfer Standard, PT. Pertamina (Persero), 2015. Responsibility: To investigate the losses in custody transfer of natural gas and of compressed natural gas.

Consultant Expert, Peralatan Tol, PT. Jasamarga, 2014. Responsibility: Providing recommendation for instrumentation and control for highway management systems.

Project Manager, Study and Evaluation of Telemetering Systems at PT. Pertamina EP, 2013. Responsobility: Recommend the metering installation for oil and gas production and custody transfer.

Consultant Expert, Supervisor on Installation Tol Equipment at Nusa Dua-Ngurah Rai-Benoa Tol Road Bali, PT. Jasamarga Bali Tol, 2013. Responsobility: Lead engineers to supervise the installation of Tol equipment.

Project Manager, Study and Development of Telemetering System at SP Tambun Pertamina EP, 2013. Responsobility: Detailing the metering installation for oil and gas production and custody transfer.

Project Manager, Design of People Train and Cartridge Train for Cikarang Utama Tol Gate, PT Jasamarga Cabang Jakarta-Cikampek, 2013. Responsobility: Lead engineers to design people train and cartridge train at the Gerbang Tol Cikarang Utama.

Project Manager, Noise Study Stasiun Kompresor dan Metering Pagardewa, PT. PGN, 2013. Responsibility: Lead engineers to do noise mapping and simulation for compressor and meetering stations.

Consultant Expert, Planning on Procurement and Installation of Tol Equipment for Nusa Dua-Ngurah Rai-Benoa Tol Road Bali, . Jasamarga Bali Tol, 2012 Responsibility: Providing a planning of procurements and installing toll equipments at Toll Gates Nusa Dua-Ngurah Rai-Benoa Bali

Instrument Engineer, Engineering Study Automatic Tank Gauging (ATG) System, Pertamina RU-II Dumai, 2012. Responsibility: Deliver a recommendation for ATG Systems in Pertamina RU-II Dumai

Team Leader, Control and Communication Techniques for Unmanned Autonomous Navigation, Pusan National University, South Korea, 2007-2011. Responsibility: System integration on control and communication in autonomous forklift